hydraulic module |
Traditional controlling room |
Adopts ACOL whole system, install and debugging in the same day |
Install time is long, about one week or one month |
Easy to install, just need two people. |
Installation requires more than5-10 people, and need the skilled worker install according to the drawings. |
Easy purchasing. Almost no material loss on site. |
Purchasing is complicated, hundreds of material, and the material waste is serious. |
Material is selected carefully, standardized operations, has been strictly tested, the quality is reliable |
The material quality is not all the same, temporary installers, human factors affect the installing quality. |
Specialized producing of controlling system and model selection, perfect protecting function, no worries. |
Pick up controlling system on the site, no quality controlling system, with hidden danger |
Well designed, highest efficiency of equipment, energy waste is eliminated. |
Select the right model in the site, poor generality, energy consumption excess the standard |
Can be used with all water-cooled central air conditioner equipment. |
Each project with different plan, different equipment adopts different product. |
One set module can match 160kW air conditioner, many set can be connected in parallel, less installation point, can be controlled. |
So many installation point, more hidden danger, poor controlling performance. |
As for the cost, eg: air conditioner room, simple and clear, can save 15%. |
As for the cost, eg: air conditioner room, traditional process, construction is complicated, higher 15%. |
Design and model selection is simple, can select the single/double frequency, automatic change over, many pumps can be connected in parallel, and can add or reduce the pump according to requirement. |
Required professionals design according to different project, need long time, and can not be adjusted. |
A variety of professional connection can be selected, installation with more confidence, more time-saving. |
All materials need to purchase on the market, quality and reliability are poor, the purchasing lead time is long. |